Projects with Vinci
Metro Line 3
Location: Cairo
Main Contractor: J.V for civil works led by Vinci.
Description: Supply and install electrical works for 4 underground stations.
(Cairo Fair, Stadium, Kolleyet El Banat and Al Ahram)
Phase: 2
Duration: February 2012 - Under Construction
Electrical
Metro Line 3
Location: Cairo
Main Contractor: J.V for civil works led by Vinci.
Description: Supply and install electrical works for 5 underground stations.
(Attaba, Bab El Sharia, El Geish, Abdou Pasha and Abbasia)
Phase: 1
Duration: June 2009 - February 2012
Electrical
Metro Line 3
Location: Cairo
Main Contractor: J.V for civil works led by Vinci.
Description: Conceptual design for fire fighting in 5 underground stations.
Duration: November 2008 - February 2011
Consulting
Nagaa Hammady New Barrage
Location: Nagaa Hammady
Orascom Construction Industries
Description: Supply and install
- Electromechanical works
- HVAC
- Plumbing
- Fire Fighting
- Potable Water
- Water Treatment
Duration: April 2006 - August 2008
Electrical / Mechanical
Metro Line 2
Location: Cairo
Main Contractor: J.V Cairo Metro line 2 led by Vinci.
Description: Supply and installs the electrical works for 2 above ground multi story stations.
(Sakiat Mekky and El Monib)
Duration: December 2002 - January 2005
Electrical
Great man made river
Location: Libya
Main Contractor: Vinci Construction Grand’s Projects.
Description: Supply and install 2 water treatment plants and potable water distribution network.
Duration: December 2003 - March 2004
Mechanical
Great man made river
Location: Libya
Main Contractor: Vinci Construction Grand’s Projects.
Description: Supply and install the electrical works for the camps of Vinci construction.
Duration: August 2003 - October 2003
Electrical
El Azhar Road Tunnels
Location: Cairo
Main Contractor: Vinci Construction Grand’s Projects
Description: - HVAC system
- Plumbing system
- CCTV system
- Traffic Control System.
Duration: November 2000 - October 2001
Electrical / Mechanical
El Azhar Road Tunnels
Location: Cairo
Main Contractor: Vinci Construction Grand’s Projects
Description: Design, supply and install the Public Address system and CCTV systems in the technical gallery.
Duration: February 2000 - October 2001
Electrical
Metro Line 2
Location: Cairo
Main Contractor: J.V Cairo Metro line 2 led by Vinci.
Description: Supply and install the electrical works for 3 above ground multi story stations
(Giza, Giza Sub-urban and Feisal above ground stations and Giza inspection workshop).
Duration: August 1998 - September 2000
Electrical
Metro Line 2
Location: Cairo
Main Contractor: J.V Cairo Metro line 2 led by Vinci.
Description: Supply and install the electrical work for Cairo university multi story above ground station.
Duration: September 1997 - March 1999
Electrical
Metro Line 2
Location: Cairo
Main Contractor: J.V Cairo Metro line 2 led by Vinci.
Description: Supply and install the electrical works for 3 underground stations.
(Attaba, Abdeen and Sadat) multi story underground stations.
Duration: May 1997 - March 1999
Electrical
Metro Line 2
Location: Cairo
Main Contractor: J.V Cairo Metro line 2 led by Vinci.
Description: Supply and install the electrical works for 3 multi story underground stations.
Duration: October 1996 - May 1997
Electrical
Metro Line 2
Location: Shoubra El Kheima Cairo
Main Contractor: J.V Cairo Metro line 2 led by Vinci.
Description: Supply and install the electrical works for Shoubra El Kheima workshops.
The total area of workshops is 60000 square meter.
Duration: June 1994 - September 1996
Electrical
Metro Line 2
Location: Ramsis Cairo
Main Contractor: J.V Cairo Metro line 2 led by Vinci.
Description: Supply and install the electrical works for Mubarak underground station.
Duration: March 1996 - July 1996
Electrical