Oil Industial
Meddor
Location: Alexandria
Main Contractor: Zenar Dubai
Description: Install the Fire Fighting Systems.
Duration: March 1999 - September 2000
Mechanical
Mobil Oil
Location: Mustorod
Main Contractor: Direct contract with the owner.
Description: Supply and install the electrical works.
Hazardous Area class II,the main storage facility at Moustorod.
Duration: July 1993 - December 1993
Electrical
Esso
Location: Cairo
Main Contractor: Local Contractor
Description: Supply and install the electrical work for Gas Station (El Bakry)..
Duration: July 1992 - November 1992
Electrical
Mobil Oil
Location: Cairo
Main Contractor: Direct contract with the owner.
Description: Supply and install the fixtures, poles & cables to illuminate the
Yard Hazardous Area class II (storage facility Cairo airport).
Duration: May 1992 - June 1992
Electrical
Schlumberger Logelco inc. site
Location: Abu El Gharadik
Main Contractor: Direct contract with the owner.
Description: Supply and install the electrical works to upgrad existing installations.
Duration: February 1992 - April 1992
Electrical
Mobil Oil
Location: Heliopolis, Cairo
Main Contractor: Local Contractor
Description: Supply and install the electrical works for the administration building
for storage facility at the Cairo
Duration: January 1992 - April 1992
Electrical
Schlumberger Logelco inc. site
Location: Abu Redees & Ras El Hekma
Main Contractor: Direct contract with the owner.
Description: Electrical Auditing
Duration: August 1991 - November 1991
Electrical
Schlumberger Logelco inc. site
Location: Marsa Matrouh & Abu El Gharadik
Main Contractor: Direct contract with the owner.
Description: Electrical Auditing
Duration: June 1991 - July 1991
Electrical