Special Projects
Nagaa Hammady New Barrage
Location: Nagaa Hammady
Orascom Construction Industries
Description: Supply and install
- Electromechanical works
- HVAC
- Plumbing
- Fire Fighting
- Potable Water
- Water Treatment
Duration: April 2006 - August 2008
Electrical / Mechanical
Meddor
Location: Alexandria
Main Contractor: Zenar Dubai
Description: Install the Fire Protection Systems.
Duration: March 1999 - September 2000
Mechanical
Reftruck Lambert Factory
Location: 10th of Ramadan City
Main Contractor: Direct contract with the owner.
Description: Supply and install the electro mechanical works including explosion proof paint shop and ventilation.
Duration: June 1997 - May 1999
Electrical
Mobil Oil
Location: Mustorod
Main Contractor: Direct contract with the owner.
Description: Supply and install the electrical works. Hazardous Area class II, the main storage facility at Mustorod.
Duration: July 1993 - December 1993
Electrical
Mobil Oil
Location: Cairo
Main Contractor: Direct contract with the owner.
Description: Supply and install the fixtures, poles & cables to illuminate the
Yard Hazardous Area class II (storage facility Cairo airport).
Duration: May 1992 - June 1992
Electrical
Roussel Uclaf Egypt
Location: 6th of October City
Main Contractor: Local Contractor.
Description: Supply and install the electrical works including explosion proof works.
Duration: June 1991 - August 1992
Electrical
Arab British Dynamics (A.B.D)
Location: Cairo
Main Contractor: Laurent Bouillet
Description: The electro mechanical works for assembly building, clean area class II (Gyro manufacturing).
Duration: March 1987 - March 1988
Electrical / Mechanical
Arab British Dynamics (A.B.D)
Location: Cairo
Main Contractor: Direct Contract with the owner.
Description: Supply and install the electrical systems, painting shop, stores and administrative buildings.
Duration: May 1987 - September 1988
Electrical
Arab British Helicopters (A.B.H)
Location: Helwan
Main Contractor: Local Contractor.
Description: Supply and install the electro mechanical equipment for pumping station 540 cubic meter / hour.
Duration: May 1985 - December 1985
Mechanical
Arab British Dynamics (A.B.D)
Location: Cairo
Main Contractor: Direct contract with the owner.
Description: Supply and install two water chillers for ammunition bunkers.
Duration: February 1985 - April 1985
Mechanical