Transportation
Metro Line 3
Location: Cairo
Main Contractor: J.V for civil works led by Vinci.
Description: Supply and install electrical works for 4 underground stations.
(Cairo Fair, Stadium, Kolleyet El Banat and Al Ahram)
Phase: 2
Duration: February 2012 - Under Construction
Electrical
Metro Line 3
Location: Cairo
Main Contractor: J.V for civil works led by Vinci.
Description: Supply and install electrical works for 5 underground stations.
(Attaba, Bab El Sharia, El Geish, Abdou Pasha and Abbasia)
Phase: 1
Duration: June 2009 - February 2012
Electrical
Metro Line 3
Location: Cairo
Main Contractor: J.V for civil works led by Vinci.
Description: Conceptual design for Fire Fighting in 5 underground stations.
Duration: November 2008 - February 2011
Consulting
Metro Line 2
Location: Cairo
Main Contractor: J.V for Cairo Metro Line 2 led by Vinci.
Description: Supply and install the electrical works for 2 above ground multi story stations.
(Sakiat Mekky and El Monib)
Duration: December 2002 - January 2005
Electrical
El Azhar Road Tunnels
Location: Cairo
Main Contractor: Vinci Construction Grand’s Projects
Description: HVAC Systems, Plumbing System, CCTV System and Traffic Control System.
Duration: November 2000 - October 2001
Electrical / Mechanical
El Azhar Road Tunnels
Location: Cairo
Main Contractor: Vinci Construction Grand’s Projects
Description: Design, supply and install the Public Address System and the CCTV System in the Technical Gallery.
Duration: February 2000 - October 2001
Electrical
Metro Line 2
Location: Cairo
Main Contractor: J.V for Cairo Metro Line 2 led by Vinci.
Description: Supply and install the electrical works for 3 above ground multi story stations.
(Giza, Giza Sub-urban and Feisal above ground stations and Giza inspection workshop).
Duration: December 2002 - January 2005
Electrical
Metro Line 2
Location: Cairo
Main Contractor: J.V for Cairo Metro Line 2 led by Vinci.
Description: Supply and install the electrical works for Cairo University multi story above ground stations.
Duration: September 1997 - March 1999
Electrical
Metro Line 2
Location: Cairo
Main Contractor: J.V for Cairo Metro Line 2 led by Vinci.
Description: Supply and install the electrical works for 3 above ground multi story stations.
(Attaba, Abdeen and Sadat).
Duration: December 2002 - January 2005
Electrical
Campenon Bernard SGE
Location: Cairo
Main Contractor: Campenon Bernhard SGE.
Description: Supply and install the Fire Alarm System for Bab El Louk Offices.
Duration: May 1998 - June 1998
Electrical
Metro Line 2
Location: Cairo
Main Contractor: J.V for Cairo Metro Line 2 led by Vinci.
Description: Supply and install the electrical works for 3 above ground multi story stations.
Duration: October 1996 - May 1997
Electrical
Metro Line 2
Location: Shoubra El Kheima Cairo
Main Contractor: J.V for Cairo Metro Line 2 led by Vinci.
Description: Supply and install the electrical works for Shoubra El Kheima workshops.
The total Area of workshops is 60.000 square meters.
Duration: June 1994 - September 1996
Electrical
Metro Line 2
Location: Ramsis Cairo
Main Contractor: J.V for Cairo Metro Line 2 led by Vinci.
Description: Supply and install the electrical works for Mubarak underground station.
Duration: March 1996 - July 1996
Electrical