Transportation

Metro Line 3

Location:              Cairo
Main Contractor:  J.V for civil works led by Vinci.
Description:          Supply and install electrical works for 4 underground stations.
                            (Cairo Fair, Stadium, Kolleyet El Banat and Al Ahram)
Phase:                 2
Duration:              February 2012 - Under Construction

                            Electrical

Metro Line 3

Location:              Cairo
Main Contractor:  J.V for civil works led by Vinci.
Description:          Supply and install electrical works for 5 underground stations.
                            (Attaba, Bab El Sharia, El Geish, Abdou Pasha and Abbasia)
Phase:                 1
Duration:              June 2009 - February 2012

                            Electrical

Metro Line 3

Location:              Cairo
Main Contractor:  J.V for civil works led by Vinci.
Description:          Conceptual design for Fire Fighting in 5 underground stations.
Duration:              November 2008 - February 2011

                            Consulting

Metro Line 2

Location:              Cairo
Main Contractor:  J.V for Cairo Metro Line 2 led by Vinci.
Description:          Supply and install the electrical works for 2 above ground multi story stations.
                            (Sakiat Mekky and El Monib)
Duration:              December 2002 - January 2005

                            Electrical

El Azhar Road Tunnels

Location:              Cairo
Main Contractor:  Vinci Construction Grandís Projects
Description:          HVAC Systems, Plumbing System, CCTV System and Traffic Control System.
Duration:              November 2000 - October 2001

                            Electrical / Mechanical

El Azhar Road Tunnels

Location:              Cairo
Main Contractor:  Vinci Construction Grandís Projects
Description:          Design, supply and install the Public Address System and the CCTV System in the Technical Gallery.
Duration:              February 2000 - October 2001

                            Electrical

Metro Line 2

Location:              Cairo
Main Contractor:  J.V for Cairo Metro Line 2 led by Vinci.
Description:          Supply and install the electrical works for 3 above ground multi story stations.
                            (Giza, Giza Sub-urban and Feisal above ground stations and Giza inspection workshop).
Duration:              December 2002 - January 2005

                            Electrical

Metro Line 2

Location:              Cairo
Main Contractor:  J.V for Cairo Metro Line 2 led by Vinci.
Description:          Supply and install the electrical works for Cairo University multi story above ground stations.
Duration:              September 1997 - March 1999

                            Electrical

Metro Line 2

Location:              Cairo
Main Contractor:  J.V for Cairo Metro Line 2 led by Vinci.
Description:          Supply and install the electrical works for 3 above ground multi story stations.
                            (Attaba, Abdeen and Sadat).
Duration:              December 2002 - January 2005

                            Electrical

Campenon Bernard SGE

Location:              Cairo
Main Contractor:  Campenon Bernhard SGE.
Description:          Supply and install the Fire Alarm System for Bab El Louk Offices.
Duration:              May 1998 - June 1998

                            Electrical

Metro Line 2

Location:              Cairo
Main Contractor:  J.V for Cairo Metro Line 2 led by Vinci.
Description:          Supply and install the electrical works for 3 above ground multi story stations.
Duration:              October 1996 - May 1997

                            Electrical

Metro Line 2

Location:              Shoubra El Kheima Cairo
Main Contractor:  J.V for Cairo Metro Line 2 led by Vinci.
Description:          Supply and install the electrical works for Shoubra El Kheima workshops.
                            The total Area of workshops is 60.000 square meters.
Duration:              June 1994 - September 1996

                            Electrical

Metro Line 2

Location:              Ramsis Cairo
Main Contractor:  J.V for Cairo Metro Line 2 led by Vinci.
Description:          Supply and install the electrical works for Mubarak underground station.
Duration:              March 1996 - July 1996

                            Electrical