Nagaa Hammady New Barrage

Location:               Nagaa Hammady
Main Contractor:   Vinci Construction Grands Projects
                             Orascom Construction Industries
                             Bilfinger Berger AG
Consultancy:          Lahmeyer International GmbH   
Description:           Supply and install
                             -  Electromechanical works
                             -  HVAC
                             -  Plumbing
                             -  Fire Fighting
                             -  Potable Water
                             -  Water Treatment
Duration:               April 2006 - August 2008

                             Electrical / Mechanical


Meddor

Location:               Alexandria
Main Contractor:   Zenar Dubai
Description:           Install the Fire Protection Systems.
Duration:               March 1999 - September 2000

                                   Mechanical

Reftruck Lambert Factory

Location:               10th of Ramadan City
Main Contractor:   Direct contract with the owner.
Description:           Supply and install the electro mechanical works including explosion proof paint shop and ventilation.
Duration:               June 1997 - May 1999

                             Electrical

Mobil Oil

Location:                Mustorod
Main Contractor:    Direct contract with the owner.
Description:            Supply and install the electrical works. Hazardous Area class II, the main storage facility at Mustorod.
Duration:                July 1993 - December 1993

                              Electrical

Mobil Oil

Location:               Cairo
Main Contractor:   Direct contract with the owner.
Description:           Supply and install the fixtures, poles & cables to illuminate the
                             Yard Hazardous Area class II (storage facility Cairo airport).
Duration:               May 1992 - June 1992

                             Electrical

Roussel Uclaf Egypt

Location:               6th of October City
Main Contractor:   Local Contractor.
Description:           Supply and install the electrical works including explosion proof works.
Duration:               June 1991 - August 1992

                             Electrical

Arab British Dynamics (A.B.D)

Location:                Cairo
Main Contractor:    Laurent Bouillet
Description:            The electro mechanical works for assembly building, clean area class II (Gyro manufacturing).
Duration:                March 1987 - March 1988

                              Electrical / Mechanical

Arab British Dynamics (A.B.D)

Location:               Cairo
Main Contractor:   Direct Contract with the owner.
Description:           Supply and install the electrical systems, painting shop, stores and administrative buildings.
Duration:               May 1987 - September 1988

                             Electrical

Arab British Helicopters (A.B.H)

Location:                Helwan
Main Contractor:    Local Contractor.
Description:            Supply and install the electro mechanical equipment for pumping station 540 cubic meter / hour.
Duration:                May 1985 - December 1985

                              Mechanical

Arab British Dynamics (A.B.D)

Location:                Cairo
Main Contractor:    Direct contract with the owner.
Description:            Supply and install two water chillers for ammunition bunkers.
Duration:                February 1985 - April 1985

                              Mechanical