Oil Industial


Meddor

Location:               Alexandria
Main Contractor:   Zenar Dubai
Description:           Install the Fire Fighting Systems.
Duration:               March 1999 - September 2000

                             Mechanical

Mobil Oil

Location:               Mustorod
Main Contractor:   Direct contract with the owner.
Description:           Supply and install the electrical works.
                             Hazardous Area class II,the main storage facility at Moustorod.
Duration:               July 1993 - December 1993

                             Electrical

Esso

Location:               Cairo
Main Contractor:   Local Contractor
Description:           Supply and install the electrical work for Gas Station (El Bakry)..
Duration:               July 1992 - November 1992

                             Electrical

Mobil Oil

Location:               Cairo
Main Contractor:   Direct contract with the owner.
Description:           Supply and install the fixtures, poles & cables to illuminate the
                             Yard Hazardous Area class II (storage facility Cairo airport).
Duration:               May 1992 - June 1992

                             Electrical

Schlumberger Logelco inc. site

Location:               Abu El Gharadik
Main Contractor:   Direct contract with the owner.
Description:           Supply and install the electrical works to upgrad existing installations.
Duration:               February 1992 - April 1992

                             Electrical

Mobil Oil

Location:               Heliopolis, Cairo
Main Contractor:   Local Contractor
Description:           Supply and install the electrical works for the administration building
                             for storage facility at the Cairo
Duration:               January 1992 - April 1992

                             Electrical

Schlumberger Logelco inc. site

Location:               Abu Redees & Ras El Hekma
Main Contractor:   Direct contract with the owner.
Description:           Electrical Auditing
Duration:               August 1991 - November 1991

                             Electrical

Schlumberger Logelco inc. site

Location:               Marsa Matrouh & Abu El Gharadik
Main Contractor:   Direct contract with the owner.
Description:           Electrical Auditing
Duration:               June 1991 - July 1991

                             Electrical
Harb Electro Mechanical Engineering Co.