Projects with Mobil Oil

Mobil Oil

Location:               Mustorod
Main Contractor:   Direct contract with the owner.
Description:           Supply and install the electrical works. Hazardous Area class II, the main storage facility at Mustorod.
Duration:               July 1993 - December 1993

                             Electrical

Mobil Oil

Location:                Cairo
Main Contractor:    Direct contract with the owner.
Description:            Supply & install the fixtures, poles & cables to illuminate the Yard Hazardous Area class II
                              (storage facility Cairo airport).
Duration:              May 1992 - June 1992

                              Electrical

Mobil Oil

Location:                Heliopolis, Cairo
Main Contractor:    Local Contractor
Description:            Supply and install the electrical works for the administration building for storage facility at the Cairo Airport.
Duration:                January 1992 - April 1992

                              Electrical